The customer operated a Murray R type turbine built in 1958. This turbine drives a sugar mill. The case presented steam leaks and visible cracks, representing a safety issue for the customer. The turbine was locally repaired (welded) many times, but no improvement was observed. They contacted Siemens Energy to obtain a drop-in replacement steam turbine with an upgraded trip and throttle valve.